Seven California counties have paused data center approvals
Los Angeles bars large-scale data centers, San Mateo and Tehama are drafting rules and the other 48 have no data center rules. Every row links its source: county codes, Board agendas, CEQA filings and news coverage, checked Nov 16, 2026.
All 58 counties
Showing all 58 counties.
| County | Key rules | Pending action | Projects | Sources | Checked |
|---|---|---|---|---|---|
| AlamedaNo data center rules | Title 17 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy). | None found in agenda, CEQAnet or news searches. | In Hayward: STACK's SVY03A campus received a CEC small power plant exemption (May 2025). | GoCodebook: Alameda County CodeCEQAnet: STACK SVY03A Data Center Campus, May 2025 | Nov 16, 2026 |
| AlpineNo data center rules | Title 18 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Alpine County Code, Oct 2026 edition | Nov 16, 2026 |
| AmadorNo data center rules | Title 19 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Amador County Code, Oct 2026 edition | Nov 16, 2026 |
| ButteNo data center rules | Chapter 24 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Butte County Code, Oct 2026 edition | Nov 16, 2026 |
| CalaverasMoratorium | Urgency ordinance imposing a temporary moratorium on approving or developing data centers in the unincorporated county, taken up by the Board Aug 25, 2026; the county filed its CEQA exemption Aug 31. Title 17 (Zoning) does not mention data centers. | An urgency moratorium lasts 45 days, to about Oct 9, 2026, unless extended. We found no extension vote; confirm with the Planning Department before relying on this row. | None found in CEQAnet since 2021. | CEQAnet: Calaveras data center moratorium (exemption, Aug 31, 2026) | Nov 16, 2026 |
| ColusaNo data center rules | Chapter 44 (Zoning Code) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Colusa County Code, Oct 2026 edition | Nov 16, 2026 |
| Contra CostaNo data center rules | Title 8 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | Cities act on their own: Oakley and Richmond have moratoria (Richmond extended its moratorium through Sept 15, 2028), and Pittsburg approved changes for the AVAIO Pittsburg Data Hub backup generating facility (Feb 2026). | GoCodebook: Contra Costa County Code, Oct 2026 editionCEQAnet: Richmond moratorium extension, Oct 27, 2026CEQAnet: AVAIO Pittsburg backup generating facility, Feb 2026 | Nov 16, 2026 |
| Del NorteNo data center rules | Titles 20 and 21 (Zoning and Coastal Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Del Norte County Code, Oct 2026 edition | Nov 16, 2026 |
| El DoradoNo data center rules | Title 130 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: El Dorado County Code, Oct 2026 edition | Nov 16, 2026 |
| FresnoNo data center rules | The Zoning Ordinance and the building and business titles do not mention data centers (GoCodebook copy). | A resident petition asks the county for a moratorium; none is scheduled. The City of Fresno is moving toward a citywide ban. | None found in CEQAnet since 2021. | GoCodebook: Fresno County Zoning CodeKMPH: Fresno moves forward with citywide ban | Nov 16, 2026 |
| GlennNo data center rules | Title 15 (Unified Development Code) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Glenn County Code, Oct 2026 edition | Nov 16, 2026 |
| HumboldtMoratorium | A 45-day urgency ordinance adopted Oct 6, 2026 (26-949) bars accepting applications for data centers in the unincorporated county. As amended, a data center under 15 MW that runs on 100% on-site renewable power, uses closed-loop cooling and has a water source that does not conflict with public trust resources can still seek a Conditional Use Permit. | A 10-month, 15-day extension covering large data centers (26-1110) is on the Nov 17, 2026 Board agenda. Without it the moratorium ends about Nov 20. | None found in CEQAnet since 2021. | Humboldt Legistar 26-949: 45-day moratorium, Oct 6, 2026Humboldt Legistar 26-1110: extension, Nov 17, 2026 agenda | Nov 16, 2026 |
| ImperialMoratorium | Title 9 lists data centers as a use in the M-1 (inside an enclosed building) and M-2 industrial zones, and Ord. 1616 says they are permitted by right there. The Board adopted a new urgency moratorium 5-0 on Oct 6, 2026, after a Superior Court ruling in August threw out the June 16 moratorium (Ord. 1616) and its July 14 extension (Ord. 1618). | The 19-member Data Center Advisory Committee reports in January 2027. Supervisors Escobar and Cardenas-Singh back a ballot measure to ban data centers on unincorporated land; no vote is set. The length of the Oct 6 ordinance is not confirmed: a new urgency moratorium runs 45 days, to about Nov 20, 2026, unless extended. | Imperial Data Center (Imperial Valley Computer Manufacturing, about 950,000 sq ft on a 75-acre merged site at Aten and Clark roads, next to the city of Imperial): lot merger approved Apr 7, 2026; the developer is suing over the moratorium. The county staff report cites several pending applications in the Mesquite Lake Specific Plan area. | KPBS: supervisors reinstate the moratorium, Oct 8, 2026Imperial County: moratorium update after the ruling, Aug 28, 2026CEQAnet: Lot Merger #00191 for a data center complex, Apr 2026GoCodebook: Imperial County Title 9, M-1 zone | Nov 16, 2026 |
| InyoNo data center rules | Title 18 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Inyo County Code, Oct 2026 edition | Nov 16, 2026 |
| KernNo data center rules | Title 19 (Zoning) does not mention data centers. Kern County is the CEQA lead agency for the Golden Valley Technology Hub. | Golden Valley Technology Hub EIR: notice of preparation Nov 2, 2026. RB Inyokern Data Center: CEC small power plant exemption (26-SPPE-01) under review; county and Indian Wells Valley Groundwater Authority permits would still be needed. A resident petition asks for a county moratorium; none is scheduled. | Golden Valley Technology Hub (California Resources Corp., 275 MW, 395,500 sq ft, Elk Hills Oil Field near Taft). RB Inyokern Data Center (R&L Capital, 99 MW of backup generation, near US 395 and SR 178). | CEQAnet: Golden Valley Technology Hub, notice of preparation, Nov 2, 2026CEC: RB Inyokern Data Center (26-SPPE-01)GoCodebook: Kern County Code | Nov 16, 2026 |
| KingsNo data center rules | The Development Code and the building and business titles do not mention data centers (GoCodebook copy, June 2026 edition). | None found in agenda, CEQAnet or news searches. | Global Stack has proposed an edge computing site at the Kings County Fairgrounds, which is state fair land outside county permitting. Ameresco plans a 100 MW AI data center at Naval Air Station Lemoore, under federal review. Hanford's general plan and zoning do not allow data centers. | GoCodebook: Kings County Development Code, June 2026 editionKVPR: Global Stack fairground proposals, July 29, 2026GV Wire: Valley data centers and water, Aug 17, 2026 | Nov 16, 2026 |
| LakeNo data center rules | Chapter 21 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Lake County Code, Oct 2026 edition | Nov 16, 2026 |
| LassenNo data center rules | Title 18 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Lassen County Code, Oct 2026 edition | Nov 16, 2026 |
| Los AngelesBan | Title 22 has no data center use. On Sept 17, 2026 the Regional Planning Director relied on that gap to prohibit large-scale data centers in every zone of the unincorporated county until the code is amended. The Board motion of Oct 6 separates these from enterprise, accessory and sole-source data centers. | The Oct 6, 2026 Solis motion directs a Title 22 amendment that defines data centers by acreage, floor area, megawatts and water use and prohibits large-scale ones in all zones, plus a noise ordinance review. The Board postponed the vote after heavy public comment (CalMatters, Oct 22); no new date found. | No data centers in the unincorporated county (Apr 14, 2026 motion). The county counts more than 70 in its cities, which zone them. | LA County Board: Solis motion, Oct 6, 2026 (PDF)LA County: report back to the Board, Aug 17, 2026 (PDF)LAist (CalMatters): vote postponed, Oct 22, 2026LA County Regional Planning: data centers | Nov 16, 2026 |
| MaderaNo data center rules | Title 18 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Madera County Code, Oct 2026 edition | Nov 16, 2026 |
| MarinNo data center rules | Titles 20 and 22 (Coastal Zoning and Development Code) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Marin County Code, Oct 2026 edition | Nov 16, 2026 |
| MariposaNo data center rules | The Zoning Code and the building and business titles do not mention data centers (GoCodebook copy, June 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Mariposa County Zoning Code, June 2026 edition | Nov 16, 2026 |
| MendocinoMoratorium | An urgency ordinance adopted 5-0 on Sept 1, 2026 (26-0776) bars new data centers in the unincorporated county. On Oct 6, 2026 the Board extended it by 22 months 15 days (26-0912). | Runs to about Aug 31, 2028 unless the Board ends it sooner. The county plans to write a permanent data center ordinance during the pause. | None proposed (Mendocino Voice, July 8, 2026). | Mendocino Legistar 26-0776: urgency ordinance, Sept 1, 2026Mendocino Legistar 26-0912: extension, Oct 6, 2026Mendocino Voice: 5-0 vote, Sept 2, 2026 | Nov 16, 2026 |
| MercedNo data center rules | Title 18 (Zoning Code) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Merced County Code, Oct 2026 edition | Nov 16, 2026 |
| ModocNo data center rules | Title 18 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Modoc County Code, Oct 2026 edition | Nov 16, 2026 |
| MonoNo data center rules | The Zoning Code and the building and business titles do not mention data centers (GoCodebook copy, June 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Mono County Zoning Code, June 2026 edition | Nov 16, 2026 |
| MontereyNo data center rules | Titles 20 and 21 (Coastal Zoning and Zoning) and the building and business titles do not mention data centers (GoCodebook copy). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Monterey County Code | Nov 16, 2026 |
| NapaNo data center rules | Title 18 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | Global Stack's proposal at the Calistoga fairgrounds ended after the city's fairgrounds committee stopped talks. | GoCodebook: Napa County Code, Oct 2026 editionThe Business Journal: fair board lease vote, July 2026 | Nov 16, 2026 |
| NevadaNo data center rules | Title 12 (Zoning Regulations) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Nevada County Code, Oct 2026 edition | Nov 16, 2026 |
| OrangeNo data center rules | Title 7 (Land Use and Building Regulations) and the building and business titles do not mention data centers (GoCodebook copy). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Orange County Code | Nov 16, 2026 |
| PlacerNo data center rules | Chapter 17 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Placer County Code, Oct 2026 edition | Nov 16, 2026 |
| PlumasNo data center rules | Title 9 (Planning and Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Plumas County Code, Oct 2026 edition | Nov 16, 2026 |
| RiversideNo data center rules | Title 17 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy). | None found in agenda, CEQAnet or news searches. | In cities: Coachella has banned data centers; Indio, Palm Springs and Desert Hot Springs have moratoria; Banning is barring them from the commercial and industrial districts of its Sunset Crossroads specific plan (Oct 2026). | GoCodebook: Riverside County CodeCEQAnet: Palm Springs moratorium extension, Oct 1, 2026CEQAnet: Banning Sunset Crossroads amendment, Oct 29, 2026 | Nov 16, 2026 |
| SacramentoNo data center rules | The Zoning Code does not mention data centers. The only code mention is Sec. 16.89, which counts data centers as research and development space for the affordable housing fee on non-residential construction. | None found in agenda, CEQAnet or news searches. | Prime Data Centers expansion at McClellan Business Park, North Highlands: a two-story, 110,269 sq ft data center and an 8,378 sq ft generator building beside its existing 68,450 sq ft data center, approved Feb 5, 2026. | CEQAnet: Prime Data Centers McClellan expansion (determination, Feb 25, 2026)GoCodebook: Sacramento County Zoning Code, June 2026 edition | Nov 16, 2026 |
| San BenitoNo data center rules | Title 25 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: San Benito County Code | Nov 16, 2026 |
| San BernardinoNo data center rules | Title 8 (Development Code) and the building and business titles do not mention data centers (GoCodebook copy). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: San Bernardino County Code | Nov 16, 2026 |
| San DiegoNo data center rules | The Zoning Ordinance has no data center use type. The county says a large-scale data center would be classed as Major Impact Services and Utilities and need a Major Use Permit, with environmental review and public hearings. | The July 14, 2026 report back to the Board lists options, including a formal determination on that classification and a zoning definition for data centers. Further action needs a new public hearing; none is scheduled. | No data centers of any size and no complete data center Use Permit applications in the unincorporated county (July 14, 2026). | San Diego County: report back on AI data centers, July 14, 2026 (PDF)San Diego County: data centers FAQGoCodebook: San Diego County Code | Nov 16, 2026 |
| San FranciscoMoratorium | A 45-day interim zoning moratorium (Supervisor Walton) passed unanimously Oct 6, 2026 and took effect with Mayor Lurie's signature, reported Oct 16. It pauses approvals of new data centers and of expansions. Before the pause, data centers usually needed Conditional Use approval from the Planning Commission. | Runs to about Nov 30, 2026 unless extended; state law allows extensions up to 22 months 15 days. The Planning Department is due to present its findings at a hearing when the 45 days end. | Paused: NOVVA's expansion at 400 Paul Ave in Bayview (9 MW to 36 MW by 2028) and a 49.5 MW project in Dogpatch. | SF Standard: Lurie signs the moratorium, Oct 16, 2026Mission Local: supervisors pass the moratorium, Oct 6, 2026NBC Bay Area: conditional use process, Sept 2026 | Nov 16, 2026 |
| San JoaquinMoratorium | A 45-day moratorium on land-use approvals for data centers in the unincorporated county, adopted 5-0 on Oct 6, 2026. The county says it has no standards for data center noise, energy demand, emergency response or infrastructure capacity. | Ends about Nov 20, 2026 unless the Board extends it; an extension can run 10 months 15 days. We have not found an extension item. | No applications and no data centers in the unincorporated county (county release, Sept 1, 2026). | San Joaquin County: Board orders data center study, Sept 1, 2026FOX40: county adopts moratorium, Oct 2026mgrid: 5-0 vote, Oct 7, 2026 | Nov 16, 2026 |
| San Luis ObispoNo data center rules | Titles 22 and 23 (Land Use and Coastal Zone Land Use) and the building and business titles do not mention data centers (GoCodebook copy). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: San Luis Obispo County Code | Nov 16, 2026 |
| San MateoDraft rules | On Oct 20, 2026 the Board directed Planning and Building staff to prepare zoning amendments for data centers (26-853); wording about a possible countywide ban was dropped before the vote. The Zoning Regulations do not mention data centers today. | An interim urgency moratorium on siting, building, converting or expanding data centers (26-932) is on the Nov 17, 2026 Board agenda. | Global Stack LLC has proposed a data center at the county-owned San Mateo County Event Center. | San Mateo Legistar 26-853: zoning direction, Oct 20, 2026San Mateo Legistar 26-932: moratorium, Nov 17, 2026 agenda | Nov 16, 2026 |
| Santa BarbaraNo data center rules | The Land Use and Development Code, Coastal Zoning Ordinance and Montecito code and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Santa Barbara County Code, Oct 2026 edition | Nov 16, 2026 |
| Santa ClaraNo data center rules | Appendix I (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | In San Jose, which zones them: the Northtown Backup Generating Facility (97.3 MW, CEC review, notice of preparation July 2026) and Microsoft's San Jose Data Center (84 gas generators, air permit Aug 2026). | GoCodebook: Santa Clara County Code, Oct 2026 editionCEQAnet: Northtown Backup Generating Facility, July 2026CEQAnet: Microsoft San Jose Data Center, Aug 2026 | Nov 16, 2026 |
| Santa CruzNo data center rules | Title 13 (Planning and Zoning) and the building and business titles do not mention data centers (GoCodebook copy). | On Sept 15, 2026 the Board voted 3-2 against a proposal to let voters decide on AI data centers in the unincorporated county. | None found in CEQAnet since 2021. | GoCodebook: Santa Cruz County CodeLocal News Matters: 3-2 vote, Sept 16, 2026 | Nov 16, 2026 |
| ShastaNo data center rules | Title 17 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Shasta County Code, Oct 2026 edition | Nov 16, 2026 |
| SierraNo data center rules | Title 15 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Sierra County Code, Oct 2026 edition | Nov 16, 2026 |
| SiskiyouNo data center rules | Title 10 (Planning and Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Siskiyou County Code, Oct 2026 edition | Nov 16, 2026 |
| SolanoNo data center rules | Chapter 28 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy). | Measure E on the Nov 3, 2026 ballot would expand the county's business license tax on energy production, data centers included. It was losing 37.6% to 62.3% in KQED's Nov 13 count; certification is due by Dec 3. | In cities: a state Department of General Services data center at 1020 Vaquero Circle, Vacaville (CEQA exemption, Feb 2026). Benicia introduced data center zoning rules Oct 20, 2026. | GoCodebook: Solano County CodeSolano Legistar 26-552: Measure E election resolutionCEQAnet: Benicia data center zoning amendments, Oct 28, 2026 | Nov 16, 2026 |
| SonomaNo data center rules | Chapter 26 (Zoning Regulations) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Sonoma County Code, Oct 2026 edition | Nov 16, 2026 |
| StanislausNo data center rules | Title 21 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | Patterson (city) adopted a 45-day data center moratorium July 16, 2026. | GoCodebook: Stanislaus County Code, Oct 2026 editionSave Mount Diablo: Patterson moratorium, 2026 | Nov 16, 2026 |
| SutterNo data center rules | The Zoning Code (1500 series) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Sutter County Code, Oct 2026 edition | Nov 16, 2026 |
| TehamaDraft rules | Chapter 17.34 lists data centers as a permitted use in the M-1 Light Industrial zone, with no data center standards. | Rezone #26-03, requested by the Board, would move data centers from permitted to Conditional Use Permit in M-1. Staff will take it to the Planning Commission and then the Board; the CEQA exemption was filed Nov 16, 2026. No hearing date is posted. | None found in CEQAnet since 2021. | CEQAnet: Rezone #26-03, M-1 data centers (exemption, Nov 16, 2026)GoCodebook: Tehama County Code, Ch. 17.34 (M-1) | Nov 16, 2026 |
| TrinityNo data center rules | Title 17 (Zoning) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Trinity County Code, Oct 2026 edition | Nov 16, 2026 |
| TulareMoratorium | Urgency Interim Ordinance 3669, adopted Aug 18, 2026, bars new data center development in the unincorporated county. In late September the Board voted 5-0 to extend it 10 months 15 days. | Runs through Aug 6, 2027 while the county drafts permanent zoning rules. The Board also voted to oppose data centers proposed by nearby cities during the pause. | Global Stack proposed an edge computing site at the Tulare County Fairgrounds, which is state fair land outside county permitting; the fair board tabled the lease. | CEQAnet: extension of Ord. 3669 through Aug 6, 2027 (exemption, Oct 1, 2026)KMPH: 5-0 extension vote, Sept 2026Our Valley Voice: Aug 18 vote, Aug 20, 2026 | Nov 16, 2026 |
| TuolumneNo data center rules | The Zoning Code and the building and business titles do not mention data centers (GoCodebook copy, July 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Tuolumne County Zoning Code, July 2026 edition | Nov 16, 2026 |
| VenturaNo data center rules | Division 8 (Planning and Development) and the building and business titles do not mention data centers (GoCodebook copy). | None found in agenda, CEQAnet or news searches. | Global Stack has floated an edge computing site at the Ventura County Fairgrounds, which is state fair land outside county permitting. | GoCodebook: Ventura County CodeSpectrum News: Ventura fairgrounds proposal, Sept 4, 2026 | Nov 16, 2026 |
| YoloNo data center rules | Title 8 (Land Development and Zoning) and the building and business titles do not mention data centers (GoCodebook copy). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Yolo County Code | Nov 16, 2026 |
| YubaNo data center rules | Title XI (Development Code) and the building and business titles do not mention data centers (GoCodebook copy, Oct 2026 edition). | None found in agenda, CEQAnet or news searches. | None found in CEQAnet since 2021. | GoCodebook: Yuba County Code, Oct 2026 edition | Nov 16, 2026 |

County briefs
A brief covers one county in depth: the rules in force, pending changes, every project proposed in the last five years, how the supervisors voted and the next hearing date. Every claim links to its source. Briefs cover battery storage and data center sites, and Stephen Lloyd writes each one.